{"id":9,"date":"2026-11-04T07:30:04","date_gmt":"2026-11-04T07:30:04","guid":{"rendered":"https:\/\/demo.galussothemes.com\/gt-interior-design\/kitchen-remodel-order-of-decisions\/"},"modified":"2026-11-04T07:30:04","modified_gmt":"2026-11-04T07:30:04","slug":"kitchen-remodel-order-of-decisions","status":"publish","type":"post","link":"https:\/\/demo.galussothemes.com\/gt-interior-design\/kitchen-remodel-order-of-decisions\/","title":{"rendered":"The order of decisions in a kitchen remodel"},"content":{"rendered":"<p class=\"wp-block-paragraph\">A kitchen remodel involves hundreds of choices, and making them in the wrong order is the main reason projects run late. This is the sequence we follow with clients and contractors.<\/p><h2 class=\"wp-block-heading\">Layout and appliances first<\/h2><p class=\"wp-block-paragraph\">Decide where the sink, range and refrigerator go and choose the actual appliance models before anything else. Cabinet widths, the hood, the electrical plan and even the island size depend on them. Changing a range from thirty to thirty-six inches later can mean redrawing every cabinet.<\/p><p class=\"wp-block-paragraph\">This is also the moment to decide on lighting positions, outlets in the island and where small appliances will live so the counters stay clear.<\/p><h2 class=\"wp-block-heading\">Cabinets and storage<\/h2><p class=\"wp-block-paragraph\">With the layout fixed, we draw the cabinets: door style, drawer sizes, the height of the uppers or whether to have uppers at all. Most cabinet makers need six to ten weeks to build, so the order goes in early.<\/p><h2 class=\"wp-block-heading\">Stone, tile and hardware<\/h2><p class=\"wp-block-paragraph\">Countertops are templated only after the cabinets are installed, but the slab should be chosen and reserved well before. We visit the stone yard with you, because two slabs of the same name can look completely different.<\/p><p class=\"wp-block-paragraph\">Backsplash tile, hardware and the sink follow the stone, so the colours and finishes work together. We bring samples of each to your kitchen to see them in place.<\/p><h2 class=\"wp-block-heading\">Paint and finishing touches last<\/h2><p class=\"wp-block-paragraph\">Wall paint comes last, once the stone and tile are in and you can see them in your light. The same is true for pendants, stools and window treatments. A good contractor and a clear decision schedule keep a typical kitchen to ten to fourteen weeks of construction.<\/p><p class=\"wp-block-paragraph\">We give every client a one-page decision schedule at the start, with a date beside each choice. It sounds simple, but it is the single document contractors thank us for most often.<\/p>","protected":false},"excerpt":{"rendered":"<p>Layout before cabinets, cabinets before stone, stone before paint. The sequence that saves weeks and rework.<\/p>\n","protected":false},"author":44,"featured_media":10,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[2],"tags":[],"class_list":["post-9","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-design-notes"],"_links":{"self":[{"href":"https:\/\/demo.galussothemes.com\/gt-interior-design\/wp-json\/wp\/v2\/posts\/9","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/demo.galussothemes.com\/gt-interior-design\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/demo.galussothemes.com\/gt-interior-design\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/demo.galussothemes.com\/gt-interior-design\/wp-json\/wp\/v2\/users\/44"}],"replies":[{"embeddable":true,"href":"https:\/\/demo.galussothemes.com\/gt-interior-design\/wp-json\/wp\/v2\/comments?post=9"}],"version-history":[{"count":0,"href":"https:\/\/demo.galussothemes.com\/gt-interior-design\/wp-json\/wp\/v2\/posts\/9\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/demo.galussothemes.com\/gt-interior-design\/wp-json\/wp\/v2\/media\/10"}],"wp:attachment":[{"href":"https:\/\/demo.galussothemes.com\/gt-interior-design\/wp-json\/wp\/v2\/media?parent=9"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/demo.galussothemes.com\/gt-interior-design\/wp-json\/wp\/v2\/categories?post=9"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/demo.galussothemes.com\/gt-interior-design\/wp-json\/wp\/v2\/tags?post=9"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}