Decks built on proper footings
We build pressure-treated and composite decks with concrete footings, joist tape on the framing and railings at the right height. Larger decks attached to the house usually need a permit, and we take care of the drawings.
Included
- Design sketch and materials list
- Concrete footings
- Framing with joist tape
- Stairs and railings
- Clean-up
Prices
| Deck | Typical size | Price |
|---|---|---|
| Pressure-treated | 12 × 16 ft with stairs | from $38/sq ft |
| Composite boards, treated frame | 12 × 16 ft with stairs | from $62/sq ft |
| Board replacement | per board | from $24 |
Questions
How long does a deck take?
One to two weeks on site for most decks, after any permit is approved.
Can you build over an old deck?
Only if the old frame and footings are sound. We check them at the estimate.
