GT Floor · live demo with sample contentGet this themeAll demos

Mon–Fri 8:00–17:30 · Sat showroom 9:00–14:00 · 2814 Gallatin Pike, Nashville, TN 37216 Call +1 (615) 555-0148

How long does a hardwood refinish take, and can you stay at home?

Four days for most rooms, seven before rugs go back. A day-by-day look at sanding, staining and finishing.

·

Space

A full sand and refinish brings tired oak back to bare wood and gives it a new finish. For a typical first floor it takes four working days, and most families stay at home while we do it.

Day one: sanding

We move the furniture, put up plastic dust walls and seal the vents. Then the floor is sanded three times with finer paper each pass, plus the edges and corners by hand. Our sanders are connected to dust extractors, so the house stays far cleaner than people expect.

Day two: filling and stain

Gaps and nail holes are filled and the floor is buffed smooth. If you want a colour, we brush test squares of three or four stains on your own boards, because the same stain looks different on red oak and white oak. You choose, and we stain the whole floor.

Days three and four: finish coats

We apply three coats of finish, with a light buff between coats so they bond. Water-based finishes dry in a few hours and have very little smell. Oil-based finishes give a warmer amber tone but need longer between coats and good ventilation.

Living with it

You can walk on the floor in socks 24 hours after the last coat. Furniture with felt pads can go back after two to three days, but wait seven days before putting rugs down, because the finish is still curing underneath.

Pets should stay off the floor for the first two days, and it helps to trim their nails before they come back. Expect a faint smell for a day or two with water-based finish, longer with oil, so keep a window cracked if the weather allows.

If you have only one bathroom or the kitchen is part of the job, we can do the house in two halves so you always have a way through.