Designed from your roof and your bills
We measure the roof, model shade through the year and compare the expected production with your last twelve months of use. You get a written design with the panel layout and every assumption on the page.
Included
- Roof and shade assessment
- Written design and production estimate
- Panels, inverter and racking
- City permit and utility application
- Monitoring app set up on the day
Estimate ranges
| System | Panels | Installed price |
|---|---|---|
| 4 kW | 10 | $11,600–$14,000 |
| 6 kW | 15 | $17,400–$20,500 |
| 8 kW | 20 | $23,200–$27,000 |
Questions
How long from signing to switch-on?
Usually four to eight weeks: permits and utility approval take longer than the install itself.
Do panels damage the roof?
Every mount is flashed and sealed. Roof penetrations are covered by our 10-year workmanship warranty.
