GT Construction · live demo with sample contentGet this themeAll demos

Office Mon–Fri 7:00–17:00 · Site visits Sat 9:00–13:00 · 3220 N Davidson St, Charlotte, NC 28205 Call +1 (704) 555-0163

Prices

What projects usually cost

Starting prices and typical ranges from our recent contracts in the Charlotte area. Every project gets a written, fixed estimate before you commit.

Price guide

Design visit

free1 hr

At your house, inside our service area

Detailed estimate and drawings

$4502 weeks

Credited in full when you sign

Hall bathroom remodel

from $18,0003–5 weeks

Tile, tub or shower, vanity, fan

Primary bathroom remodel

from $32,0005–8 weeks

Tile shower, double vanity, new layout

Kitchen remodel

from $45,0008–12 weeks

Cabinets, tops, electrical, floors

Basement finishing

from $48,0008–10 weeks

Framing, insulation, egress, bathroom

Pressure-treated deck

from $14,0002–3 weeks

About 12 by 16 ft, railings and steps

Screened porch

from $28,0004–6 weeks

On a new or existing deck

Room addition

from $120,0004–6 months

One room, crawlspace or slab

Whole-home renovation

from $180,0004–8 months

Phased structure, systems and finishes

Prices include labour, standard materials, permits and disposal, before any selections above the allowances. Houses built before 1978 may need lead-safe work practices, which we price separately.

Typical ranges by project size

Where most of our recent projects landed. Your estimate depends on the house, the layout and your selections.

ProjectSmallerTypicalLarger
Bathroom$18,000–$25,000$25,000–$40,000$40,000 and up
Kitchen$45,000–$65,000$65,000–$95,000$95,000 and up
Basement$48,000–$70,000$70,000–$100,000$100,000 and up
Deck or porch$14,000–$25,000$25,000–$45,000$45,000 and up
Addition$120,000–$160,000$160,000–$240,000$240,000 and up

Price questions

Why do you charge for a detailed estimate?

A fixed price needs measured drawings and quotes from our trade partners, about two days of work. The $450 is credited in full when you sign, and the drawings are yours either way.

How do payments work?

A deposit of 10 percent at signing, then payments tied to progress: rough-in inspection, cabinets or drywall, and completion. You never pay ahead of the work.

What if the price changes?

Only through a signed change order: your request or something hidden we find, with a price and any schedule change, before the work is done.

Start with a free design visit

Tell us about the project and pick a date. A project manager comes to the house, measures and talks it through, with no charge and no obligation.