Our process

From the first visit to the handover

A typical kitchen remodel runs about 17 weeks from the design visit to the final inspection. Here is every phase, what we do and what we need from you.

You will always have

  • A written schedule
  • A fixed price
  • Signed change orders
  • A Friday update by email
  • One project manager

A typical project timeline

A kitchen with a wall removed, shown in weeks. Additions and whole-home projects follow the same phases over a longer build.

  1. Design visitMeasure, listen, sketch
    Week 0
  2. Design and estimateDrawings, selections, fixed price
    Weeks 1–3
  3. PermitsFiled with the county, materials ordered
    Weeks 3–6
  4. Demolition and rough-inFraming, plumbing, electrical, inspections
    Weeks 6–10
  5. FinishesDrywall, cabinets, tile, trim, paint
    Weeks 10–15
  6. Punch list and handoverFinal inspection, walkthrough, binder
    Weeks 15–17
  7. Follow-up visitsAt 1 and 11 months
    +1 and +11 mo

What we need from you at each phase

  1. Design visit. An hour at home and your wish list.
  2. Design and estimate. Your selections: cabinets, tile, fixtures, lighting.
  3. Permits. Your signature on the application and any HOA approval.
  4. Build. Quick answers to questions in the Friday update.
  5. Handover. A walkthrough with us to write the punch list together.

What you get at handover

Binder

Permit finals and drawings

The approved permit, inspection records and as-built drawings.

Binder

Product list

Every paint colour, tile, fixture and appliance, with model numbers.

Warranty

5 years in writing

Our workmanship warranty, plus the manufacturer warranties we registered for you.

Process questions

Can the schedule change?

Weather, inspections and lead times can move dates. We tell you in the Friday update as soon as we know, with the new date.

How often is someone on site?

Your project manager visits every working day. A crew is on site on most days between demolition and the punch list.

What happens at the 11-month visit?

We check for settling cracks, sticking doors and caulk joints, and fix them at no charge.