More room without moving
We start with the lot: setbacks, utilities and how the roof can tie in. Then we design the addition to match the house in brick or siding, roof pitch and trim, so from the street it looks original.
Included
- Site check and survey review
- Permit drawings and engineering
- Foundation, framing and roof tie-in
- HVAC and electrical sized for the new room
- Final inspection and certificate
Typical prices
| Addition | Time on site | From |
|---|---|---|
| One room on a crawlspace | 4–5 months | $120,000 |
| Primary suite with bathroom | 5–6 months | $175,000 |
| Second story over part of the house | 6–8 months | $240,000 |
Questions
Can we stay in the house?
Usually yes. We build the new room first and open the connecting wall near the end, behind a dust barrier.
Will it match the old brick?
We source brick to match, or suggest a siding detail that suits the house when an exact match is not available.
