Hardwood · LVP · Tile · Refinishing · Nashville since 2008
Floors chosen in your own light, fitted by our own crew
We bring the samples to your house, measure every room for free and send a written estimate within two days. Then the same Larkwood crew that measured fits, sands and finishes the floor.

In the van for your visit
- White oakNatural matte
- HickorySaddle stain
- Luxury vinyl plankCoastal grey
- Porcelain tile12×24 limestone look
Plus 140 more boards and tiles, brought to your rooms.
- White oak
- Red oak
- Hickory
- Maple
- Engineered hardwood
- Luxury vinyl plank
- Porcelain tile
- Sand and refinish
- Stair treads
- Board repairs
- Free measure
Floors we fit, sand and fix
-

Hardwood installation
Details and prices: Hardwood installationSolid and engineered oak, hickory and maple, nailed, glued or floated, with a moisture check before a single board goes down.
-

Luxury vinyl plank
Details and prices: Luxury vinyl plankWaterproof click and glue-down plank for kitchens, basements and homes with big dogs, fitted over a levelled subfloor.
-

Tile
Details and prices: TilePorcelain and ceramic floors, shower floors and entryways on backer board or an uncoupling membrane, sealed and grouted.
-

Sand and refinish
Details and prices: Sand and refinishThree-pass dust-contained sanding, stain matched on your own floor and three coats of water-based or oil finish.
-

Stairs and trim
Details and prices: Stairs and trimNew treads and risers, carpet-to-wood stair conversions, nosing, quarter round and baseboards to finish the job.
-

Floor repair
Details and prices: Floor repairWater-damaged and cracked boards replaced and woven in, squeaks fixed from below, loose tiles reset.
Floor chooser
Which floor for which room?
The short version of what we tell people at the kitchen table. Every house is different, so the measure visit includes a moisture reading and a straight answer.
Kitchen
Spills, dropped pans and a lot of standing.
- Hardwood
- Works
- LVP
- Great fit
- Tile
- Great fit
Bathroom
Water on the floor every day.
- Hardwood
- Skip
- LVP
- Works
- Tile
- Great fit
Basement
Concrete slab, below grade, damp in July.
- Hardwood
- Skip
- LVP
- Great fit
- Tile
- Works
Living and dining
The room people see first.
- Hardwood
- Great fit
- LVP
- Works
- Tile
- Works
Bedrooms
Quiet, warm underfoot, low traffic.
- Hardwood
- Great fit
- LVP
- Great fit
- Tile
- Skip
Big dogs at home
Claws, zoomies and the odd accident.
- Hardwood
- Skip
- LVP
- Great fit
- Tile
- Great fit
Prices
A price per square foot, then a written estimate
Installed prices for most Nashville homes. Moving furniture, removing old floors and stairs are listed line by line on your estimate.
| Floor | Per sq ft | The room |
|---|---|---|
| Luxury vinyl plank | $4.50–$7 | $900–$1,400 |
| Engineered hardwood | $8–$12 | $1,600–$2,400 |
| Solid oak, site-finished | $10–$15 | $2,000–$3,000 |
| Porcelain tile | $11–$18 | $2,200–$3,600 |
| Sand and refinish | $4–$6 | $800–$1,200 |
From the first sample to the 30-day check
Four steps, one crew and one point of contact from the day you call.
01
Request
Send the form or call. We text back a visit time, usually within two days.
02
Samples and measure
We bring boards and tiles to your rooms, measure with a laser and check the subfloor for moisture.
03
Install
Your crew protects the house, fits the floor and hauls the old one away.
04
Follow-up
A walk-through when we finish and a check-in visit after 30 days, gaps and squeaks fixed free.

BeforeAfterBefore and after
Ninety years of red oak, back in four days
These boards had been under carpet since the seventies. We sanded to bare wood, replaced eleven boards by the old radiator and finished with a clear water-based coat. Drag the line to compare.
- Day 1Furniture out, dust walls up, three-pass sand to bare wood.
- Day 2Fill, buff and stain. You pick the colour from test squares on your own floor.
- Day 3First and second coat of water-based finish, light buff in between.
- Day 4Final coat. Socks on after 24 hours, rugs and furniture back after 7 days.
Why we check the moisture first
Nashville summers push indoor humidity past sixty percent, and wood moves with it. Every hardwood job starts with a moisture reading of the boards and the subfloor, and the boards rest in your rooms until they match. That is how a floor stays flat in August and tight in January.
- 1,860,000square feet fitted since 2008
- 3,400homes measured for free
- 48 hrsfrom measure to written estimate
- 2 yrsworkmanship warranty on every job
Where we measure this week
Sample visits in Davidson, Sumner, Williamson and Wilson counties. No trip fee within 30 miles.
- East Nashville and InglewoodNext day
- Germantown, The Nations, Sylvan ParkWithin 2 days
- 12 South, Belmont, Green HillsWithin 2 days
- Hendersonville and GallatinWithin 3 days
- Brentwood and FranklinWithin 3 days
- Mt. Juliet and HermitageWithin 3 days
- Antioch and SmyrnaWithin 4 days
What Nashville homeowners say
★★★★★
“They laid three samples in our kitchen at nine in the morning and came back at five so we could see them in evening light. We would have picked the wrong grey.”
Hannah and Luis P. · LVP, kitchen and den, Inglewood
★★★★★
“The estimate listed every line, even the stair nosing. Final bill matched it to the dollar.”
Marcus T. · White oak, whole first floor, Brentwood
★★★★★
“Refinished our 1940s oak in four days. Dust walls up the whole time and the house was cleaner than when they arrived.”
Ellen R. · Sand and refinish, Sylvan Park
Free measure, and $250 off 500 sq ft or more
Book your in-home samples and measure this month. Mention the code and we take $250 off any installation of 500 square feet or more. One per household.
Mention codeLARKWOOD250
Floor notes
Showroom and phones
- Monday–Friday
- 8:00–17:30
- Saturday
- 9:00–14:00, showroom
- Sunday
- Closed
+1 (615) 555-0148
2814 Gallatin Pike, Nashville, TN 37216


