Design process
From first consultation to install day
Every project follows the same six steps, so you always know what comes next, what you need to decide and when your room will be finished.
Typical timelines
- E-design: 3–4 weeks
- One room: 8–12 weeks
- Kitchen: 6–10 weeks of design
- Whole home: 4–8 months
Six steps
- Consultation. Two hours in your home. We measure, photograph and listen, then send written notes within a week.
- Proposal. A package and fee for the rooms you want designed, with a schedule.
- Concept. Floor plan, lighting plan, mood boards and real samples, presented at the studio.
- Refine. Up to two rounds of revisions until every piece and finish is approved.
- Source and track. We order at trade price, track each piece and receive it at our warehouse.
- Install day. Everything delivered, placed, hung and styled in one day.
Three ways to work with us
Design fees agreed before we start. Furnishings and construction are separate.
Consultation
$295 two hours in your home
Advice, measurements and a written plan of quick wins.
- Walk-through of up to four rooms
- Measurements and photos
- Written notes within a week
- A shopping list for quick wins
- Fee credited to a package within three months
Most chosen
Per room
from $3,200 per room
Full-room design, from concept to install day.
- Floor plan and lighting plan
- Concept boards and real samples
- Two rounds of revisions
- Sourcing at trade price
- Order tracking and receiving
- Install day with styling
Full home
from $18,000 whole home
Every room designed as one plan with one schedule.
- All living spaces and bedrooms
- Colour and materials for the whole house
- Contractor meetings on site
- One sourcing schedule
- Phased installs if you live in the home
- Final styling and art hanging
Half the design fee is due when we start and the rest at the concept presentation.
How long each stage takes
Weeks for a typical full-room project. Custom upholstery sets the pace.
| Stage | One room | Kitchen | Whole home |
|---|---|---|---|
| Consultation and proposal | 1–2 | 1–2 | 2–3 |
| Concept and revisions | 3–4 | 4–6 | 6–10 |
| Ordering and delivery | 4–14 | with construction | 8–16 |
| Install day | 1 day | after construction | phased |
What you decide, and when
We ask for decisions in a clear order: the layout first, then the large pieces, then finishes, then the small things. You never choose a cushion before the sofa is approved.
Between meetings you have an online board with every item, price and lead time, so you can share it with your family and comment at your own pace.
You approve
- The floor plan
- Each furniture piece and its price
- Paint, tile and fabric samples
- The install date
Process questions
What if I do not like the concept?
Two rounds of revisions are included. In twelve years, very few clients have needed more.
Do I need to be home on install day?
No. Most clients leave in the morning and come back in the evening to a finished room.
What happens if something arrives damaged?
We inspect every piece at our receiving warehouse before it reaches your home and handle any claims with the supplier.
The first step is a conversation
Book a consultation and we will walk your rooms with you, then send written notes within a week.