Our work
Rooms on the day we handed them back
Recent projects from across the Valley, photographed on install day. Drag the line to see a living room before and after.
Before and after
Drag the line to compare.

BeforeAfterThe owners wanted a brighter room that seated six without a giant sectional. We limewashed the brick fireplace, removed the valances, added two linen sofas facing each other and moved the television to a new built-in wall.
- Brief. Brighter, calmer, seating for six.
- Changed. Limewash, two sofas, built-in media wall, new lighting.
- Time. Eleven weeks from concept to install day.
Recent rooms
Kitchens, bedrooms, baths and patio rooms from this year.








Client notes
★★★★★
“Celia found a way to keep my grandmother’s sideboard and still make the room feel new. I sit in there every morning now.”
Hannah W. · Living room, Arcadia
★★★★★
“The concept meeting had real samples on the table. We could feel the fabric and see the tile in our own light before ordering anything.”
Marco and Jill P. · Kitchen design, North Scottsdale
★★★★★
“E-design was perfect for our condo. The shopping list was clear, the measurements were right and everything fit on the first try.”
Devon A. · E-design, Old Town
★★★★★
“Theo sorted out a tile problem with our contractor in ten minutes on site. The bathroom is exactly what was drawn.”
Priya N. · Bathroom design, Tempe
★★★★★
“Our house was staged in six days and the listing photos looked like a magazine. It sold in the first weekend.”
Greg and Susan L. · Home staging, Gilbert
★★★★★
“Install day was like a television reveal, except it was our house and nothing was missing.”
Alana R. · Whole home, Paradise Valley
Start with a consultation
Two hours in your home, written notes within a week, and the fee credited to a package if you go ahead.