GT Architecture · live demo with sample contentGet this themeAll demos

Studio Mon–Thu 9:00–17:30 · Fri 9:00–15:00 · 2045 Pearl St, Boulder, CO 80302 Call +1 (303) 555-0148

Process

Four phases, one architect, fees agreed in advance

Every project follows the same path, from a site walk to the final inspection. You approve each phase and its fee before the next one begins.

Before phase 1

  • Free 30-minute call
  • Site walk, $350, 90 minutes
  • A written note of what the lot allows

The four phases

Typical times for an ADU or an addition. A new home takes roughly twice as long.

3 weeks

Feasibility

Zoning, survey and site review, massing options, a cost range and a timeline. Fixed fee of $2,400.

6–8 weeks

Schematic design

Two or three plan options, 3D models, a chosen scheme and a first cost check with a builder.

10–14 weeks

Design and permit set

Materials, details, engineering coordination and the full drawing set, submitted for permit.

Build time

Bidding and construction

Builder selection, site visits every one or two weeks, answers for the crew and the final walk-through.

The fee structure

Phases 2 to 4 as a share of the total design fee. Fixed sums for ADUs, additions and renovations; a percentage of construction cost for new homes.

PhaseShare of the feePaidYou approve
1. FeasibilityFixed $2,400At the startThe report and the cost range
2. Schematic design20%Half at the start, half on approvalOne chosen scheme
3. Design and permit set45%MonthlyThe drawing set before submission
4. Bidding and construction35%Monthly during the buildThe builder and any changes

What we ask of you

  1. A survey. An improvement location certificate or a full survey; we can arrange it.
  2. Decisions on time. A reply within a week at each review keeps the schedule.
  3. A budget. A real number, so we design to it.
  4. Access. Two or three visits to the house or lot during design.

Process questions

Can we stop after a phase?

Yes. You own the drawings of each phase you have paid for and can stop or pause at any point between phases.

Who hires the engineer?

We recommend one and coordinate the work; the engineer contracts with you directly.

How long does the permit take?

It depends on the city or county and the season. We give you a current estimate in the feasibility report.

Start with a site walk

Ninety minutes on your lot and a written note of what it allows, for $350.