Process
Four phases, one architect, fees agreed in advance
Every project follows the same path, from a site walk to the final inspection. You approve each phase and its fee before the next one begins.
Before phase 1
- Free 30-minute call
- Site walk, $350, 90 minutes
- A written note of what the lot allows
The four phases
Typical times for an ADU or an addition. A new home takes roughly twice as long.
3 weeks
Feasibility
Zoning, survey and site review, massing options, a cost range and a timeline. Fixed fee of $2,400.
6–8 weeks
Schematic design
Two or three plan options, 3D models, a chosen scheme and a first cost check with a builder.
10–14 weeks
Design and permit set
Materials, details, engineering coordination and the full drawing set, submitted for permit.
Build time
Bidding and construction
Builder selection, site visits every one or two weeks, answers for the crew and the final walk-through.
The fee structure
Phases 2 to 4 as a share of the total design fee. Fixed sums for ADUs, additions and renovations; a percentage of construction cost for new homes.
| Phase | Share of the fee | Paid | You approve |
|---|---|---|---|
| 1. Feasibility | Fixed $2,400 | At the start | The report and the cost range |
| 2. Schematic design | 20% | Half at the start, half on approval | One chosen scheme |
| 3. Design and permit set | 45% | Monthly | The drawing set before submission |
| 4. Bidding and construction | 35% | Monthly during the build | The builder and any changes |
What we ask of you
- A survey. An improvement location certificate or a full survey; we can arrange it.
- Decisions on time. A reply within a week at each review keeps the schedule.
- A budget. A real number, so we design to it.
- Access. Two or three visits to the house or lot during design.
Process questions
Can we stop after a phase?
Yes. You own the drawings of each phase you have paid for and can stop or pause at any point between phases.
Who hires the engineer?
We recommend one and coordinate the work; the engineer contracts with you directly.
How long does the permit take?
It depends on the city or county and the season. We give you a current estimate in the feasibility report.
Start with a site walk
Ninety minutes on your lot and a written note of what it allows, for $350.