Prices
Fees by phase, agreed before we draw
Every project starts with a fixed-price feasibility study or site walk. Design fees are then a fixed sum per phase or a percentage of construction cost, set out in a written agreement.
How a design fee is split
For an ADU, an addition or a new home. You approve each phase before the next one starts.
| Phase | What you get | Share of the fee |
|---|---|---|
| 1. Feasibility | Zoning and site review, massing options, cost range | Fixed $2,400 |
| 2. Schematic design | Two or three plan options, 3D model, a builder’s cost check | 20% |
| 3. Design development and permit set | Materials, details, engineering coordination, permit submission | 45% |
| 4. Bidding and construction | Builder selection, site visits, answers for the crew, final walk-through | 35% |
Price questions
Why is a new home a percentage?
The work grows with the size and complexity of the house. We fix the percentage in the agreement and convert it to a set sum once the builder has priced the design.
Do you charge for the first meeting?
A 30-minute call is free. The site walk is $350, credited if you go on to a feasibility study.
How do we pay?
By phase: an invoice when each phase starts and the balance when it is approved. Bank transfer or card.
Start with a site walk
Tell us about the lot and what you want to build. We reply within two working days to book a site walk or a feasibility study.