GT Architecture · live demo with sample contentGet this themeAll demos

Studio Mon–Thu 9:00–17:30 · Fri 9:00–15:00 · 2045 Pearl St, Boulder, CO 80302 Call +1 (303) 555-0148

Projects

Selected projects, with the facts

Four recent houses: what the owners asked for, what the site allowed and how long it took from the first site walk to move-in.

140+

Homes drawn

4

Shown here

0

Permits refused

Four recent houses

New home · Sunshine Canyon · 2025

Sunshine Canyon house

A 2,850 sq ft house on a steep, wildfire-zone lot. The roof tips to the winter sun, cedar siding sits over a board-formed concrete base, and the living room looks east down the canyon. Design 9 months, build 13 months.

Backyard cottage · Whittier · 2025

Whittier garden ADU

A 640 sq ft one-bedroom cottage at the end of a narrow garden, built for the owners’ parents. Step-free from the alley, a skylit bathroom and a porch facing the main house. Design 5 months, build 7 months.

Addition · Table Mesa · 2024

Table Mesa second storey

A 920 sq ft second storey on a 1960s ranch: three bedrooms and a bathroom upstairs, the old roofline kept at the street. The family moved out for four months. Design 6 months, build 8 months.

Renovation · Mapleton Hill · 2024

Mapleton bungalow

A 1,700 sq ft 1920s bungalow with the kitchen moved to the garden side and a new stair. Historic district review included. Design 4 months, build 6 months.

Project facts

ProjectTypeAreaSiteDesignBuild
Sunshine Canyon houseNew home2,850 sq ftSteep mountain lot, wildfire zone9 months13 months
Whittier garden ADUBackyard cottage640 sq ftNarrow lot with alley access5 months7 months
Table Mesa second storeyAddition+920 sq ftSuburban lot, existing ranch house6 months8 months
Mapleton bungalowRenovation1,700 sq ftHistoric district4 months6 months

We asked for more space and got a house that finally works in the morning: light in the kitchen, a stair in the right place and room for the kids upstairs.

Graham T., Table Mesa second storey

Have a project in mind?

Tell us about the lot and what you want to build. We reply within two working days.