Author: Nora Wrenfield
-

Five things to check before you design a backyard cottage
Lot size, setbacks, parking, utilities and who will live there: the questions that decide whether an ADU works on your…
-

What a feasibility study tells you before you spend on design
Three weeks, a fixed fee and a clear answer: what the lot allows, a cost range and a realistic timeline.
-

How architects’ fees work: fixed, percentage and hourly
Three ways to pay for design, when each one makes sense, and what should always be written down.
-

Designing for Colorado sun: windows, overhangs and winter light
Three hundred sunny days a year are a gift and a problem. How orientation and overhangs keep a house bright…
-

Add on or move? Questions to ask before an addition
A second storey or a rear wing can give you the space you need without leaving the neighbourhood. When it…
-

What is in a permit set, sheet by sheet
Site plan, floor plans, elevations, sections and details: the drawings the city reviews and the builder builds from.